Air conditioning: heat load and equipment choice
Calculate an office's cooling load and choose splits, cassettes or VRF.
Your trainer · Serge Fotso
Buy this course, or subscribe
One-off purchase
Lifetime access to this course
25 000 FCFA
or
What you will learn
- Carry out a heat load calculation
- Compare air conditioning systems
- Select and place the equipment
About this course
The climate in Douala and Yaoundé makes sizing critical. You carry out the heat load of an office floor, compare systems and write the selection note.
- Prerequisites
- Basic building physics.
- Who it is for
- HVAC technicians and engineers
Course content
2 chapters · 4 lessons · 52 min
- External and internal gainsFree preview12 min
- The calculation sheet15 min
- End-of-module quiz
- Split, cassette, ducted, VRF13 min
- Placement and refrigerant lines12 min
- End-of-module quiz
Project files included
- bilan-thermique.xlsx260 Ko
Downloadable from your space after purchase or with the subscription.
A certificate at the end
Finish every lesson and pass the quizzes: your PDF certificate is generated automatically, with a code any employer can verify.
Your trainer

Serge Fotso
MEP engineer
Designs plumbing, electrical and air conditioning networks for buildings, and models them in Revit MEP.
Learner reviews
Heat load step by step, with local examples. Exactly what I was missing.
Junior K.HVAC technician
Frequently asked questions
For life if you buy the course. With a subscription, for as long as it is active.
By bank card, Visa or Mastercard, on a secure payment page. The course unlocks as soon as payment is confirmed.
Yes, on computer, tablet and phone. Playback resumes where you stopped.
A trial or student version is enough to follow the course. The first lesson shows how to get one.
Similar courses
Béton arméEurocode 2Reinforced concrete: hand calculation basics
Carine Ngo Bassa
20 000 FCFA
PlomberieRéseauxBuilding plumbing: designing water networks
Serge Fotso
15 000 FCFA
RevitMEPRevit MEP: modelling plumbing, electrical and HVAC
Serge Fotso
50 000 FCFANew
MétréDevisQuantity surveying: preparing a bill of quantities
Estelle Kamga
20 000 FCFA
30 000 FCFA
TopographieImplantationSurveying: setting out a building on site
Estelle Kamga
15 000 FCFA
