Surveying: setting out a building on site
Use a level and a total station to set out grids and levels without mistakes.
Your trainer · Estelle Kamga
Buy this course, or subscribe
One-off purchase
Lifetime access to this course
15 000 FCFA
or
What you will learn
- Use a level and a total station
- Set out building grids
- Check levels and plumb
About this course
A setting-out error costs for the whole job. The instruments, methods and checks to set out a building right, from pegs to slab levels.
- Prerequisites
- None.
- Who it is for
- Site supervisors, technicians, students
Course content
2 chapters · 5 lessons · 52 min
- Level, theodolite, total stationFree preview11 min
- Setting up9 min
- End-of-module quiz
- Setting out grids14 min
- Transferring levels10 min
- Checks8 min
- End-of-module quiz
Project files included
- carnet-implantation.xlsx120 Ko
Downloadable from your space after purchase or with the subscription.
A certificate at the end
Finish every lesson and pass the quizzes: your PDF certificate is generated automatically, with a code any employer can verify.
Your trainer

Estelle Kamga
Quantity surveyor
Bills of quantities, estimates and site follow-up. Teaches quantity surveying in Excel and from BIM models.
Learner reviews
Revit used to scare me. The running project makes everything concrete, and videos resume where you stopped.
Aïcha M.Junior architect My estimates are now clear and justified. Clients sign faster.
Patrick N.Building contractor
Frequently asked questions
For life if you buy the course. With a subscription, for as long as it is active.
By bank card, Visa or Mastercard, on a secure payment page. The course unlocks as soon as payment is confirmed.
Yes, on computer, tablet and phone. Playback resumes where you stopped.
A trial or student version is enough to follow the course. The first lesson shows how to get one.
Similar courses
Béton arméEurocode 2Reinforced concrete: hand calculation basics
Carine Ngo Bassa
20 000 FCFA
PlomberieRéseauxBuilding plumbing: designing water networks
Serge Fotso
15 000 FCFA
ClimatisationBilan thermiqueAir conditioning: heat load and equipment choice
Serge Fotso
25 000 FCFA
MétréDevisQuantity surveying: preparing a bill of quantities
Estelle Kamga
20 000 FCFA
30 000 FCFA
Civil 3DVoirieCivil 3D: roads, earthworks and profiles
Estelle Kamga
40 000 FCFA
